FREE SHIPPING
On All U.S. Orders
1–3 BUSINESS DAYS
Order Processing
5–7 BUSINESS DAYS
Estimated Delivery
24/7 SUPPORT
We're Here to Help
  • About Us
  • Contact Us
  • FAQ’s
Hikaye 9 Hikaye 9
Select category
  • Select category
  • BACKYARD
  • E-Bikes
  • Furniture
  • Generators
  • Home page
  • LAWN MOWER
  • Wooden Playsets
Login / Register
0 Wishlist
0 Compare
0 items / $0.00
Menu
Hikaye 9 Hikaye 9
0 items / $0.00
Browse Categories
  • Furniture
  • BACKYARD
  • Generators
  • LAWN MOWER
  • E-Bikes
  • Wooden Playsets
  • Home
  • Shop
  • About Hikaye9
  • Track Your Order
  • Contact Us
  • FAQ’s
☎ +1 (631) 899-7427   ✉ support@hikaye9.com
Sale
Click to enlarge
HomeE-Bikes Greesum 8×6 FT Outdoor Storage Shed – Plastic Resin Shed with Floor, Window & Lockable Door for Garden Tools & Bikes
Previous product
Greesum 10x8 FT Outdoor Storage Shed - Resin Shed with Floor, 3 Windows & Skylights for Garden Tools, Patio & Backyard Storage
Greesum 10x8 FT Outdoor Storage Shed - Resin Shed with Floor, 3 Windows & Skylights for Garden Tools, Patio & Backyard Storage $1,299.99 Original price was: $1,299.99.$816.99Current price is: $816.99.
Back to products
Next product
Guardian Series 22 Kw/19.5 Kw Air Cooled Home Standby Generator with Wi-Fi with Whole Hoe 200 Amp Transfer Switch
Guardian Series 22 Kw/19.5 Kw Air Cooled Home Standby Generator with Wi-Fi with Whole Hoe 200 Amp Transfer Switch $1,704.56

Greesum 8×6 FT Outdoor Storage Shed – Plastic Resin Shed with Floor, Window & Lockable Door for Garden Tools & Bikes

$829.99 Original price was: $829.99.$522.49Current price is: $522.49.

15 in stock

Compare
Add to wishlist
SKU: GS-40486-0617 Category: E-Bikes Tag: Sheds
Share
  • Description
  • Shipping & Delivery
Description

Keep your outdoor space organized and clutter-free with the Greesum 8×6 FT Plastic Outdoor Storage Shed. Made from durable, eco-friendly HDPE plastic, this spacious resin shed features a reinforced floor, adjustable window, and lockable door—providing the perfect storage solution for garden tools, outdoor equipment, bikes, and more.

Why Choose Greesum?

Crafted from recyclable, high-density polyethylene, this shed is lightweight yet incredibly tough, resisting cracks, rust, and harsh weather for long-lasting performance. The innovative design requires 35% fewer screws for quicker, hassle-free assembly. With a double-reinforced plastic floor for stability and an adjustable window to maximize natural light, this shed combines functionality with durability.

Key Features

  • Easy & Fast Assembly – 35% fewer screws required for quicker setup. Press wall panels firmly downward during installation to ensure they fully snap into the floor channel.

  • Durable & Eco-Friendly Construction – Made from recyclable, high-density polyethylene (HDPE). Lightweight yet tough, resisting cracks, rust, and harsh weather for long-lasting performance.

  • Reinforced Floor, Adjustable Window & Lockable Door – Double-reinforced plastic floor for stability. Adjustable window maximizes natural light, reducing need for extra lighting. Secure lockable door for added safety.

  • Spacious Storage Solution – Measuring 66.1″D x 91.3″W x 94.5″H, offering ample space for garden tools, outdoor equipment, bikes, and more—keeping your belongings organized and protected.

What’s Included

Complete storage shed kit including all panels, reinforced floor, hardware, and adjustable window. Assembly required.

Specifications

Specification Details
Brand Greesum
Manufacturer Greesum
Model Number GS-40486-0617
Manufacturer Part Number (MPN) GS-40486-0617
Size 8×6 FT
Color Beige
Material Type HDPE Plastic
Base Material Plastic
Top Material Type HDPE Plastic
Frame Material HDPE Plastic
Product Dimensions (D x W x H) 66.1″ x 91.3″ x 94.5″
Door Style Traditional (Lockable)
Water Resistance Level Water Resistant
Window Adjustable Window
Floor Double-Reinforced Plastic Floor
Style Traditional
Recommended Uses Garden Tools, Outdoor Equipment, Bikes, Lawn Equipment, Patio Supplies
Assembly Required Yes (35% Fewer Screws)
Shipping & Delivery

SHIPPING & DELIVERY

At Hikaye9, we work to make every order simple, secure, and reliable. Once your order is placed, our team carefully processes and prepares your equipment for shipment.

ORDER PROCESSING

Orders are typically processed within 1–3 business days. Once your order has been prepared for shipment, you will receive a confirmation email with tracking information when available.

DELIVERY TIME

› Processing: 1–3 business days
› Estimated Transit: 5–7 business days
› Shipping Area: United States
› Tracking: Provided after shipment

Delivery estimates may vary depending on the destination, carrier, product size, weather conditions, and other circumstances outside our control.

LARGE & HEAVY EQUIPMENT

  • Lawn mowers, generators, furniture, and other oversized products may require freight or specialized delivery. Delivery requirements and available services may vary depending on the product and destination.

    TRACK YOUR ORDER

    Once tracking information is available, you can follow the progress of your shipment through our Track Your Order page.

    For shipping questions, contact our customer support team:

    Email: support@hikaye9.com
    Phone: +1 (631) 899-7427

    Hikaye9 — Reliable Equipment. Reliable Delivery.

Related products

Sale
Compare
Add to wishlist
Close

Aoxun 12×10 FT Outdoor Storage Shed – Metal Garden Shed with Double Hinged Doors for Lawn Tools, Bikes & Patio Furniture

$485.99 Original price was: $485.99.$303.99Current price is: $303.99.
Add to cart
Sale
Compare
Add to wishlist
Close

Rubbermaid Large Horizontal Resin Storage Shed – 5×4 FT Outdoor Shed with Floor, Sliding Doors & UV Protection for Patio Cushions, Garden Tools & Pool Chemicals

$434.09 Original price was: $434.09.$270.74Current price is: $270.74.
Add to cart
Sale
Compare
Add to wishlist
Close

Aoxun 8×6 Ft Outdoor Storage Shed with Floor – Large Resin Shed with Lockable Door & Windows for Lawn Tools, Pool Supplies & Bikes

$899.99 Original price was: $899.99.$565.24Current price is: $565.24.
Add to cart
Sale
Compare
Add to wishlist
Close

Greesum 10×8 FT Outdoor Storage Shed – Resin Shed with Floor, 3 Windows & Skylights for Garden Tools, Patio & Backyard Storage

$1,299.99 Original price was: $1,299.99.$816.99Current price is: $816.99.
Add to cart
Sale
Compare
Add to wishlist
Close

Suncast Horizontal Stow-Away Storage Shed – 70 cu ft Resin Shed with Hinged Lid & Lockable Doors for Trash Cans, Bikes & Yard Tools

$449.99 Original price was: $449.99.$280.24Current price is: $280.24.
Add to cart
Sale
Compare
Add to wishlist
Close

Suncast Horizontal Storage Shed – 98 cu ft Resin Shed with Sliding Lid & Lockable Doors for Bikes, Mowers & Patio Furniture

$634.99 Original price was: $634.99.$398.99Current price is: $398.99.
Add to cart
Sale
Compare
Add to wishlist
Close

ZYJOYY 6×4.4 FT Outdoor Storage Shed – 16mm Resin Shed with Floor, Window & Lockable Doors for Backyard, Garden Tools & Bikes

$459.99 Original price was: $459.99.$289.74Current price is: $289.74.
Add to cart
Sale
Compare
Add to wishlist
Close

Rubbermaid 4×2.5 FT Vertical Storage Shed – Resin Outdoor Cabinet with Floor for Garden Tools, Pool Chemicals & Patio Cushions

$466.94 Original price was: $466.94.$294.49Current price is: $294.49.
Add to cart

Hikaye 9 LLC provides dependable lawn, garden, backyard and outdoor equipment backed by industry experience and reliable customer service.

⌖

Address 29 W Main St, Smithtown, NY 11787

☎

Phone +1 (631) 899-7427

✉

Email support@hikaye9.com

BUSINESS HOURS

Mon – Fri 9 AM – 9 PM
Saturday 10 AM – 10 PM
Sunday Closed
Legal & Policy
  • Refund and Returns Policy
  • Privacy Policy
  • Terms of Service
  • Shipping Policy
  • Bulk Order Policy
  • Warranty & Guarantee Policy
  • Billing Terms and Conditions
Useful Links
  • Shop
  • About Hikaye9
  • About Me
  • Payment Methods
  • FAQ’s
  • Contact Support
  • Track Your Order
Hikaye9 Collections
  • Furniture
  • BACKYARD
  • Generators
  • LAWN MOWER
  • E-Bikes
  • Wooden Playsets

WHY CHOOSE HIKAYE 9

✓

9 Years of Experience

Hands-on experience with lawn, garden, backyard, and outdoor equipment.

⚙

Equipment Knowledge

Practical knowledge of mowers, generators, garden equipment, parts, and repairs.

◆

Reliable Supplier Network

Established relationships with equipment and material suppliers.

☎

Customer Support

Helpful assistance with products, orders, shipping, and after-purchase questions.

© 2026 Hikaye 9 LLC. All Rights Reserved. | Outdoor Equipment & Garden Solutions
payments
  • Menu
  • Categories
  • Furniture
  • BACKYARD
  • Generators
  • LAWN MOWER
  • E-Bikes
  • Wooden Playsets
  • Home
  • Shop
  • About Hikaye9
  • Track Your Order
  • Contact Us
  • FAQ’s
  • Wishlist
  • Compare
  • Login / Register
Shopping cart
close
Facebook Instagram YouTube TikTok

Sign in

close

Lost your password?

No account yet?

Create an Account